
Boss Engineering provided construction drawings, contract documents, bidding documents, and construction administration services for a Community Development Block Grant (CDBG) from Oakland County to bring existing sidewalks into ADA compliance. The project was designed and bid in the Summer of 2008 with construction commencing in the Spring of 2009.
Attachment | Size |
---|---|
Walled Lake Walks.pdf | 248.34 KB |