The project consisted of designing approximately 3000 feet of 16” watermain for extension of the existing Township water system to a new residential development on Milford Road. The project included the watermain permitting, as well as a drain crossing permit through the Oakland County Drain Commissioner and Michigan Department of Environmental Quality. The project was completed in 2007.
Attachment | Size |
---|---|
Lyon Twp Watermain.pdf | 164.55 KB |