
Bruce Township, in Macomb County, was looking to provide over one mile of water main to service their industrial district and adjacent Armada Township. The work included tapping into a 96” DWSD water main, installing a meter pit, pressure reducing pit, and installing 200 feet of 16” main and over 10,000 lineal feet of 12” water main. The project was completed in 2011 and cost over $800,000.
Attachment | Size |
---|---|
Bruce Township H2O.pdf | 301.33 KB |