
Boss Engineering performed an exhaustive analysis of the existing water system, including hardy-cross evaluation of existing and future demand needs. This study resulted in revealing areas of low pressure and potential fire flow deficiencies that have become part of a five year plan with the MDEQ to reconstruct and replace infrastructure on a priority basis. Future growth can be accommodated with the system upgrades recommended.
Attachment | Size |
---|---|
Walled Lake Water Reliability.pdf | 541.46 KB |