Eleven lot residential development designed with 1/4 mile long concrete road, cul-de-sac, and open ditch drainage. Boss Engineering’s responsibilities included the road engineering, construction plan preparation, and all inspections during the construction process.
Attachment | Size |
---|---|
Conc.pdf | 246.26 KB |