Municipal Projects

Boss Engineering has performed surveying, site engineering, and more for a variety of municipal projects. Learn more about our work in this area by reading the municipal projects below.

Boss Engineering provided construction drawings, contract documents, bidding documents, and construction administration services for the Village of Prescott’s proposed 30,000 gallons per day wastewater treatment facility. Boss coordinated the... Read more

Boss Engineering worked with Northfield Township to develop a submittal package for a non-motorized pathway grant offered by the Washtenaw County Parks and Recreation Department. The path connects the downtown with the residence on the west side... Read more

The project consisted of extending approximately 900 feet of low pressure sanitary forcemain for connection to an existing Township forcemain. The work included permitting through the Michigan Department of Environmental Quality.

The project consisted of designing approximately 3000 feet of 16” watermain for extension of the existing Township water system to a new residential development on Milford Road. The project included the watermain permitting, as well as a drain... Read more

Howell Township, Livingston County, Howell Township construction plan review and construction inspection on an as-needed basis. This work includes review for compliance with Township road and public utility requirements and on-site inspection for... Read more

Pages