The Hartland High School, in Hartland, MI, needed a public sewer connection design and wastewater system closure plan. Boss provided survey and engineering services that assisted in the connection of Hartland High School to the municipal sewer system. As part of the construction a closure plan and construction management was provided in order to abandoned the existing wastewater treatment system, which consisted of multi-cell wetlands, tanks, lift stations, and a sub-surface tile field.
Attachment | Size |
---|---|
Hartland High.pdf | 308.91 KB |