The First United Methodist Church Project consists of site improvements and a new 11,778 sq.ft. building addition with 6,653 sq.ft. at the main level and 5,125 sq.ft. below grade. The total building area with the addition is 32,308 sq.ft. Site improvements include adding a new water service and new storm lines to direct the rain runoff from the new addition to the existing detention basin. A new exterior stair and handicap access route were designed to provide access to the expansion.
Attachment | Size |
---|---|
First United .pdf | 295.42 KB |