
Boss Engineering provided construction drawings, contract documents, bidding documents, and construction administration services for the Brown City Water treatment plant arsenic removal system. The arsenic removal system design included piping plans, electrical, wall cross-sections, mechanical details, footing design, and the O & M manual.
Attachment | Size |
---|---|
Brown City.pdf | 299.78 KB |