Bauer and Brighton Road Pathway

Bauer and Brighton Road Pathway

Performed the survey, design, construction stakeout, construction inspection, and as-built drawings for 3.2 miles of a regional bituminous pathway linking area developments. The pathway project was performed in three phases. We performed the work for Genoa Township who received a Greenways Initiative Land Grant to install the pathway. We performed the necessary contract administration in coordination with Genoa Township for the grant funds.

Attachment Size
Genoa Pathway_0.pdf 655.97 KB