2009 Street Paving Project

[current-page:title]

Boss Engineering provided construction drawings, contract documents, bidding documents, and construction administration services for the City of Walled Lakes 2009 street paving program. A total of 9.4 miles of city streets received overband crack fill. Some streets in poor condition required either milling and overlay, or pulverizing and overlay treatment.

Attachment Size
Walled Lake Streets.pdf 681.18 KB