![[current-page:title]](/sites/default/files/default_images/be-placeholder.jpg)
Boss Engineering provided construction drawings, contract documents, bidding documents, and construction administration services for the City of Walled Lakes 2009 street paving program. A total of 9.4 miles of city streets received overband crack fill. Some streets in poor condition required either milling and overlay, or pulverizing and overlay treatment.
Attachment | Size |
---|---|
Walled Lake Streets.pdf | 681.18 KB |